Complete overhaul of a 200 kWe combined heat and power plant fuelled by biogas from a wastewater treatment plant after 40,000 hours of operation/h2>
Installation Area: Bergamo
Year of Construction: 2012
Technical specifications of the system: Complete overhaul of a 200 kWe combined heat and power plant fuelled by biogas from a wastewater treatment plant after 40,000 hours of operation
Details: Transport of the container to the workshop, complete overhaul of the DAEWOO engine including replacement of the components most prone to wear (camshaft, bearings, cylinder liners, cylinder heads, turbines, intercoolers, etc.), inspection of the alternator, repair of the gas-water tube bundle heat exchanger, cleaning of the water-water heat exchanger, repair of corroded flue pipes, replacement of electrical conduits, replacement and/or refurbishment of measuring and safety instruments, replacement of pipe insulation, inspection/replacement of gas ramp components, complete interior cleaning of the container, cleaning of the emergency radiator, painting of the generator set and container, transport of the container to site, connection and start-up.