Piping assembly, construction and insulation of the flue gas line + denox system for a 1MW biogas cogeneration plant
- Installation Area: Novara
- Year of Construction: 2012
- Technical specifications of the system: Piping assembly, construction and insulation of the flue gas line + denox system for a 1MW biogas cogeneration plant with a JENBACHER J312 engine
- Details: Assembly of water, biogas and exhaust gas piping inside the container; Assembly of components on the container roof; Initial filling with engine oil, water and battery acid; Support for the design and installation of exhaust gas piping between the silencer outlet, denox unit, afterburner and exhaust stack; Support for the design and installation of the control panel wiring for the denox and afterburner systems, including air and urea connections for the denox; Complete insulation of the exhaust gas line, denox system, service water line and biogas supply line.